It's getting chilly outside time to work inside 9/18/07


IAK

502 views

Wow it's been awhile since I added anything here :unsure: . So I've been mostly working on the outside and that is just about almost complete except for the foundation and a few little detail here and there.

blogentry-663-1190112991_thumb.jpg

blogentry-663-1190113002_thumb.jpg

blogentry-663-1190113012_thumb.jpg

I've stained glassed all the window inserts and started installing them. Which I will be doing as I finish each room.

Here's the front door: blogentry-663-1190113158_thumb.jpg

I used one of the inserts that was supposed to be for the french window on the second floor but thanks to my new dremel I was able to cut the opening and install a houseworks door to match the one I added to the side of the house.

blogentry-663-1190113346_thumb.jpg

blogentry-663-1190113407_thumb.jpg

blogentry-663-1190113445_thumb.jpg

blogentry-663-1190113484_thumb.jpg

and the finished 2nd floor hallway

blogentry-663-1190115400_thumb.jpg

So now I'm just finishing up the kitchen. I painted the wainscote that I installed a few months ago

blogentry-663-1190114825_thumb.jpg

I'm going to finish up the molding in this room today, crown and trim on top of the paneling.

Here's a picture of the 3 windows in the kitchen.

blogentry-663-1190115206_thumb.jpg

and the outside of the front kitchen window

blogentry-663-1190115250_thumb.jpg

so there ya have it...next I think will be the bathroom...

0 Comments


Recommended Comments

There are no comments to display.

Guest
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...