Jump to content

tower room second floor construction.jpg


Debora59

From the album:

1/6 scale house design

· 514 images
  • 514 images
  • 1 comment
  • 1,596 image comments

Photo Information


Recommended Comments

Bathroom tile has been grouted, base boards in, finishing crown molding, beamed the ceiling hiding the chandelier cord. ceiling is now on, rooms are stacked! Lots more to do but had to share. The front wall and ceiling of the second floor  room box is not glued in yet, as I need to finish some areas. But couldn't wait to se it stacked after all my work this past week.

Link to comment

Gorgeous, but how do you access this room once the house is built? Or do you not. :)

 

Link to comment

Thank you Yes , I have the option of rolling the tower back out to make adjustments or taking the ceiling off. These are stacking room boxes so I can lift them off separately or roll apart the sections. I can still reach the bathroom room box

7 hours ago, Samusa said:

Gorgeous, but how do you access this room once the house is built? Or do you not. :)

 

if I need to

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...