Supplies
Me: "Hey Bjørn what are you doing?"
Bjørn: "Had a delivery today. So now I'm moving the siding for my trailer next to the other pieces so you can start working on it."
Me: "But we need the other color first. And I still need to figure out how to adhere that permanently to the plywood when it has a weak adhesive backing. Its going to take a while."
Bjørn: "I like being a wanderer, going wherever my wings take me. But being homeless, that's just not cool."
Me: "Even if all the needed supplies to start with were here today, there is a lot of prep work like sanding, dry fitting, priming, figuring out the wheels, some design considerations, figuring out the internal layout and what you want, not to mention interior wallpaper/paint, flooring... And that is after getting fabrics figured out and drafting the design you want on the outside. It is far from a quick or simple project."
Bjorn: "So... in about half a week? That would be great!"
Me: "I don't think you are listening..."
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.