Jump to content
© brae oktober

Building progress


otterine

Today, I cut the window openings and worked on fine-tuning the walls and roof. I'm thinking of making the angled door wall removable to have access to the interior beyond just the removable roof. I still need to cut one more roof piece from plywood since I didn't have enough boards in my stash. I had used the original mdf roof board to cut the new front and door walls to keep the material consistent.

The height of the foundation is already better - makes the horse look more in proportion, though the landscaping will be built up and around the foundation to some extent. I'm planning a tree as well, possibly a stitched rug if I can fit it into the timeline. :] Feeling motivated finally!

Copyright

© brae oktober
  • Like 1

From the album:

Ivy Hollow - Rural Free Delivery Post Office

· 130 images
  • 130 images
  • 0 comments
  • 266 image comments

Photo Information


Recommended Comments

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...