Jump to content

Work in Progress


Dalesq

Both floors have been glued. I have the second floor ceiling piece in place for fit but have not installed it yet. 

I installed as much trim as possible while gluing everything in place because some areas will be virtually inaccessible later.

Copyright

© DAL Minis
  • Like 1

From the album:

Maison Ginny

· 32 images
  • 32 images
  • 0 comments
  • 75 image comments

Photo Information

  • Taken with Apple iPad Air 2
  • Focal Length 3.3 mm
  • Exposure Time 1/30
  • f Aperture f/2.4
  • ISO Speed 125

Recommended Comments

6 hours ago, Debsrand56 said:

This is looking so good.  Have we seen a close-up of the floors yet?  I am intrigued. . . .

I scored and stained the parlor, landing, and bedroom floor areas. The first floor hallway and kitchen are a tile pattern that I printed onto photo paper. I then scored and inked between the tiles. It’s subtle. The bath floor is a marble pattern printed onto photo paper as well.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...