Jump to content

ready to install beams



All 3 assemblies are ready to install with 1 exception. The two underneath have their excess wire coiled into a loop and tied that way with thread and the last one on top still needs that done. So the wire won't be hanging down.

From the category:

Darrell's Electrification Super Guide

· 69 images
  • 69 images
  • 9 image comments


Recommended Comments

There are no comments to display.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...